Civil Work Required to Be Carried Out at Proposed Location:
• Office Room
• Control Room
• Compressor and Cascade / Cylinder Storage Room
• Shed for Dispenser
• Toilet / Wash Room
• Under Ground Gas Piping and Power Cable
• Flooring
Project Work Related Activities
Projects Deliverables:
• 2-dual Hose Cng Pump With Hose
• Cascade and Compressor Unit With Underground Gas Pipe Line
• Land Covering 1 Office Room, 1 Bath Room, 1 Control Room and 1 Ware House
• Specification and Drawings & Layouts – Civil
• Office Building
• Control Room Building
• Boundary Wall
• Foundation for Compressor Unit, Cascade and Dispencers
• Cascade/ Cylinder Storage Room
• Specification and Drawings & Layouts – Mechanical
• Canopy
Project Constraints
• Loan Approval, if Required by an Investor
• Only Four Vehicles Can Be Served at One Time
• 50 Vehicles Can Be Refuelled Per Hour